Liaoning Hongyanhe Nuclear Power Station-Flexible Rubber Joint

Date:2021-10-25 Views:299 Author:songjiangflex
Liaoning Hongyanhe Nuclear Power Station-Flexible Rubber Joint

The official website of Shanghai Songjiang Shock Absorber Group Co., Ltd. introduces to you: Liaoning Hongyanhe Nuclear Power Station-flexible rubber joint information. Songjiang Group provides rubber joint products for many nuclear power projects. The following is for Liaoning Hongyanhe Nuclear Power Station. The flexible rubber joint is introduced in detail.

Liaoning Hongyanhe Nuclear Power Station-Flexible Rubber Joint

I. Introduction to Liaoning Hongyanhe Nuclear Power Plant:
Liaoning Hongyanhe Nuclear Power Plant is located in Hongyanhe Town, Wafangdian City. It is a nuclear power project approved for construction during the 11th Five-Year Plan period. It is the first nuclear power plant in northeast China, and it is a standardized and large-scale construction project of four million kilowatt nuclear power units.

Hongyanhe Nuclear Power Plant phase I started construction in August 2007. Unit 1 was put into operation on June 6, 2013, and subsequent units were put into commercial operation at an annual rate of one.
The construction of two units of hongyanhe Nuclear Power Plant phase II began in 2015, and the project is in good progress. It is planned to be fully completed in 2021.
At 15:09 on February 17, 2013, unit 1 was successfully connected to the grid, marking that the first nuclear power plant in northeast China has become capable of generating power.
Hongyanhe Nuclear Power Plant unit 2 started construction on March 28, 2008, and was connected to the grid for the first time on November 23, 2013. May 13, 2014. Main conditions for commercial operation.
Hongyanhe Nuclear Power Plant unit 3 started construction in March 2009, and the main conditions for commercial operation were met on August 16, 2015.
Hongyanhe Nuclear Power Unit 4 started construction on August 15, 2009. At 9:52 on April 1, 2016, Unit 4 was connected to the grid and generated power of 52 MEGAwatts, indicating that Hongyanhe Nuclear Power Unit 4 has power generation capacity.

II. [Liaoning Hongyanhe Nuclear Power Plant] Flexible rubber joint Contract Introduction:
The following is the scanned copy of the authentic contract, please do not modify or reprint it. This contract is only used as proof of supply. Thank you for your cooperation.

Liaoning Hongyanhe Nuclear Power Station-Flexible Rubber Joint
Liaoning Hongyanhe Nuclear Power Station-Flexible Rubber Joint

Link to this article: https://www.songjiangflex.com/case/liaoning-hongyanhe-nuclear-power-station-flexible-rubber-joint/