The second tender section of Xiamen Metro Line 1-rubber joints

Date:2021-10-20 Views:291 Author:songjiangflex
The second tender section of Xiamen Metro Line 1-rubber joints

[Xiamen Metro Line 1 Second Bidding Section Project] Rubber Joint Contract

 

The official website of Shanghai Songjiang Shock Absorber Group Co., Ltd. will introduce to you: [Xiamen Metro Line No. 2 Project] Rubber joint contract information, Songjiang Group provides * pipeline shock absorber products for many urban subway projects, including rubber joints , Corrugated compensator, metal hose, spring shock absorber and other products, the following is the introduction of the rubber joint and corrugated compensator provided by Songjiang Group for the second section of the project’s subway line 1.

The second tender section of Xiamen Metro Line 1-rubber joints

1. Introduction of Xiamen Metro Line 1:

Line 1 runs through Xiamen from north to south, connecting important groups such as Siming District, Huli District and Jimei District. Passing through the prosperous old city, the site is surrounded by dense buildings, the stratum is rich in water and sand, the underground pipelines are intricate, the interval boulders and bedrock bulges are serious, and the geological conditions are very complicated. It is currently the most difficult subway line in construction.

Xiamen Metro Line 1 is the first opened line of Xiamen Metro and the first north-south line in the Xiamen Rail Transit Line Network. It is operated by Xiamen Rail Transit Group Co., Ltd. The line was partially started on November 13, 2013 , The construction was fully started in April 2014, the whole line was completed in March 2017, and the trial operation began on December 31, 2017.

Xiamen Metro Line 1 has a total length of 30.3 kilometers and a total of 24 stations, including 17 general stations and 5 transfer stations. Xiamen Metro Line 1 starts from Zhenhai Road Station in the southern part of Siming District, Xiamen Island, and connects important groups such as Siming District, Huli District, Jimei District, and * at Yannei Station, Houxi Town, Jimei District. It is a backbone line that radiates from the island to the north to form a rapid cross-sea connection channel. This line has 1 vehicle depot in the Gaoqi parking lot.

Xiamen Metro Line 1 (Zhenhai Road-Yannei) is the radial skeleton line from Xiamen Island to Jimei, which constructs a fast cross-sea connection channel between Xiamen Island and Jimei, and serves Xiamen North Railway Station. The logo color is Minnan Red.

The Xiamen Metro Line 1 has a total length of 30.3km and has 24 stations. Line 1 is generally north-south, connecting important areas of Siming District, Huli District, and Jimei District. It is a backbone line that radiates from the island to the north to form a rapid cross-sea connection. Metro Line 1 is constructed along the important north-south development axis of the city, starting at Zhenhai Road Station in Siming District, laying along Zhenhai Road, Wenyuan Road, Hubin Middle Road, Hubin South Road, and Jiahe Road, and at Gaoji Seawall and Jixinghai The embankment crosses the sea and exits the island in an elevated and ground manner; after crossing the sea, it is laid underground again, along Xingjin Road, Chengyi Street, and the planned Hengshan Road, * at the north side of Xiamen North Railway Station in Houxi Town, Jimei District Iwanai Station.

Xiamen Metro Line 1 has a total of 24 stations, all of which are underground stations except for the Jimei School Station in the cross-sea section, which is an elevated station. The average distance between stations is 1.3km. Among them, there are 14 stations on the island, with an average distance between stations of 1.0km; 1 station on the cross-sea section, with an average distance between stations of 3.3km; 9 stations outside the island, with an average distance between stations of 1.4km. There are 7 transfer stations in all stations. The line will set up a Gaoqi parking lot in the northern part of the island, and a Qigou comprehensive maintenance base in the north of Jimei New City. Two main substations and a control center * are set up across the line.

Xiamen Metro Line 1 operates from 6:30-22:30 throughout the day. The one-way operation time from Zhenhai Road Station to Yannei Station is 52 minutes. The operating speed is 35km/h, and the maximum speed is 80km/h. The Xiamen Metro Line 1 vehicles are composed of 6 B-type vehicles, which can carry about 1,400 passengers. They are manufactured by CRRC Tangshan Locomotive and Rolling Stock Co., Ltd. (Tangshan Railway Passenger Vehicle Co., Ltd.).

Xiamen Metro Line 1 originally set up a branch line, which is a network-filled line, located in the Jimei cluster in the north of the city, connecting the Xinglin and Guankou areas with the main line of Line 1, thereby realizing a rapid connection between the area and the island. The line has a total length of 9.5 kilometers and has 6 stations with an average distance of 1.6 kilometers. The Tiantou Village parking lot is set up in the Guankou group at the northern end of the line. After expert consultation, demonstration and research, the branch line of Xiamen Metro Line 1 was cancelled.

2. [Xiamen Metro Line No. 2 Bidding Section Project] Introduction to the rubber joint contract:

The following is a scanned copy of the authenticity contract, please do not modify, please do not reprint, this contract is only as a proof of goods, thank you for your cooperation.

The second tender section of Xiamen Metro Line 1-rubber joints

The second tender section of Xiamen Metro Line 1-rubber joints

The second tender section of Xiamen Metro Line 1-rubber joints

3. [Xiamen Metro Line 1 Section 2 Project] Introduction of rubber joints:
*A high-quality rubber joint is from: raw materials-scientific formula-automated mixing-automated molding-automated vulcanization-finished product testing-performance testing, so that we can tell customers that our products are qualified, please rest assured to use .
*The result of a scientific rubber joint production process must *lack is performance testing. Most of them are tested for pressure, which is only qualified when pressure is tested, and performance testing is the effect of product use. This is also Respect for customers, we will do more and more responsible rubber joint products in the future, such as burst pressure testing and fatigue testing.

4. [Xiamen Metro Line No. 2 Bidding Section Project] Photographs of rubber joints:

The second tender section of Xiamen Metro Line 1-rubber jointsThe second tender section of Xiamen Metro Line 1-rubber joints