Wuhan Jianghan Oilfield Heat Supply Handover Transformation-Spring Shock Absorber

The official website of Shanghai Songjiang Shock Absorber Group Co., Ltd. introduces to you: [Wuhan Jianghan Oil Field Heating Handover and Reconstruction] Spring shock absorber contract information, Songjiang Group provides water pump spring shock absorbers for many heating projects to reduce shock And the role of noise reduction.

Wuhan Jianghan Oilfield Heat Supply Handover Transformation-Spring Shock Absorber

Our company Songjiang Group provided spring shock absorbers for the heat transfer and transformation of Wuhan Jianghan Oilfield. The heating area of ​​the first phase of the Wuhan Jianghan Oilfield heating transfer and renovation project is 2,356,600 square meters, involving more than 910 residential buildings and some public buildings, benefiting more than 22,000 residents, replacing 37,700 tons of standard coal each year, and reducing carbon dioxide emissions by 9.43 10,000 tons, 905 tons of sulfur dioxide, and 264 tons of nitrogen oxides. After the second phase of the project is completed, the emission reduction will be even greater.

Hubei’s largest geothermal energy central heating project: Jianghan Oilfield geothermal heating renovation project with a construction area of ​​nearly 5.5 million square meters

According to statistics from the Department of Housing and Urban-Rural Development of Hubei Province, in 2017, the province added more than 18 million square meters of renewable energy building area, and plans to add another 16 million square meters in 2018. The reporter came to the largest renewable energy building application project in Hubei Province-Jianghan Oilfield Geothermal Heating Renovation Project to find out.

The Jianghan Oilfield Workers’ Community provides heating in winter, with a total heating area of ​​5,481,300 square meters. For this reason, Jianghan Oilfield has 20 heating boiler houses and 44 boilers, most of which are coal-fired boilers. In the heating season from 2016 to 2017, 82,200 tons of raw coal and 4.06 million cubic meters of natural gas were consumed, and the amount of pollutants emitted was very considerable.

 

The following is a scanned copy of the contract of the [Wuhan Jianghan Oilfield Heating Transfer and Reconstruction] Spring Shock Absorber. This document is only used as a proof of supply and not for other purposes. Please do not reprint or modify it;

Wuhan Jianghan Oilfield Heat Supply Handover Transformation-Spring Shock Absorber

Wuhan Jianghan Oilfield Heat Supply Handover Transformation-Spring Shock Absorber

 

Link to this article: https://www.songjiangflex.com/case/wuhan-jianghan-oilfield-heat-supply-handover-transformation-spring-shock-absorber/