Ningde Nuclear Power Project-Rubber Joints

Date:2021-10-25 Views:309 Author:songjiangflex
Ningde Nuclear Power Project-Rubber Joints

The official website of Shanghai Songjiang Shock Absorber Group Co., Ltd. introduces you: [Ningde Nuclear Power Project] rubber joint contract information. Songjiang Group provides various rubber joints for many nuclear power projects. The following is a detailed introduction.

Ningde Nuclear Power Project-Rubber Joints

Fujian Ningde Nuclear Power Station is located in Taimushan Town, Fuding City under the jurisdiction of Ningde City. It is about 32km south of Fuding City, bordering the East China Sea in the east and Qingchuan Bay in the north. It is planned to build six million-kilowatt-level PWR nuclear power units, one plan and phased construction. The first phase of the project is planned to adopt the CPR1000 technology of China General Nuclear Power Group with its own brand to build four million-kilowatt-level PWR nuclear power units. On September 1, 2006, the National Development and Reform Commission approved the preliminary work of the first phase of the Ningde Nuclear Power Plant. The main project officially started on February 18, 2008. The first unit of Ningde Nuclear Power was put into commercial operation on April 15, 2013. Units 2, 3, and 4 were put into operation successively from 2014 to 2016, and the first phase of the project has four units. The unit was fully completed on July 21, 2016. On December 28, 2010, the engineers and technicians of the Ningde Nuclear Power Plant in Fujian were using China’s first self-developed nuclear power plant full-range simulator.

The following is a scanned copy of the [Ningde Nuclear Power Project] rubber joint contract. This document is only used as a proof of supply and not for other purposes. Please do not reprint or modify it;

Ningde Nuclear Power Project-Rubber Joints
Ningde Nuclear Power Project-Rubber Joints

Link to this article: https://www.songjiangflex.com/case/ningde-nuclear-power-project-rubber-joints/